← All projects

Electrical

Outlets, wall drilling and power the other projects need. Rayburn (volunteer electrician) is helping.

Next steps

  • ✓
    Rayburn walk-through: both breaker panels and the list on this page
    Micheal / Rayburn · 10/20: went great. Breakers are fine. Rayburn is helping with the TV outlets, the wall drilling and the gravel prep.
    Done
  • ✓
    Check the breakers
    Rayburn · 10/20: Rayburn says the breakers are fine, no issue.
    Done
  • ✓
    Decide on the auditorium lights: keep switching at the breakers, or add real switches
    Rayburn / church · 10/20: Rayburn says no issue.
    Done
  • Drill through the walls for the internet and coax runs (Rayburn's hammer drill)
    Rayburn / Micheal · Rayburn is bringing a hammer drill and bit
    To do

Rayburn, a volunteer electrician, looked everything over on 10/20. The breakers in both panels (fellowship hall and auditorium) are fine. He's helping with the TV outlets (wired through the attic), drilling through the walls for the internet and coax, and digging out the front for gravel.

What Rayburn is helping with

  • 2 outlets behind the front TVs, wired through the attic (found a way in).
  • Drilling through the walls with his hammer drill for the internet (Cat6e) and video (coax) runs.
  • Digging out the front of the building with his backhoe for gravel (see the Gravel page).
  • Checked 10/20: the breakers are fine, including the auditorium lights. Nothing to replace.
  • Spare breakers on hand (found 10/20): about 10 used breakers, including 4 Bryant BR-type and a 30 A. Not needed for the TV outlets (those tie into the existing circuit already run backstage); keep them as spares.
  • Still open for him when he has time: the open electrical box in the brick by the back door of the rooms behind the stage, and whether power still runs out to the front sign.
  • Baptistry heater: not his job. The plumber from Lexington is handling it.

Notes

  • Ask Rayburn what parts he needs for each job (outlets, boxes, wire), so they're bought before the work day.

← All projects

Unlisted working page (not in the site menu). Updated 2026-10-22.